{"id":7633,"date":"2020-06-23T14:38:32","date_gmt":"2020-06-23T12:38:32","guid":{"rendered":"http:\/\/www.hydrograv.com\/?page_id=7633"},"modified":"2024-10-24T16:19:15","modified_gmt":"2024-10-24T14:19:15","slug":"bad-berleburg","status":"publish","type":"page","link":"https:\/\/www.hydrograv.com\/en\/bad-berleburg\/","title":{"rendered":"Bad Berleburg"},"content":{"rendered":"<div id='footer-abstand-pad'  class='avia-section main_color avia-section-default avia-no-shadow  avia-bg-style-scroll  avia-builder-el-0  avia-builder-el-no-sibling   container_wrap sidebar_right' style='background-color: #dedfe3;  '  ><div class='container' ><main  role=\"main\" itemprop=\"mainContentOfPage\"  class='template-page content  av-content-small alpha units'><div class='post-entry post-entry-type-page post-entry-7633'><div class='entry-content-wrapper clearfix'>\n<div class=\"flex_column av_one_full  flex_column_div av-zero-column-padding first  avia-builder-el-1  avia-builder-el-no-sibling  column-right \" style='border-radius:0px; '><section class=\"av_textblock_section \"  itemscope=\"itemscope\" itemtype=\"https:\/\/schema.org\/CreativeWork\" ><div class='avia_textblock bg-white-b '   itemprop=\"text\" ><p style=\"text-align: justify;\"><span class=\"presse-headline-upper\" style=\"color: #0eb0ee;\"><span class=\"presse-headline-upper\">HYDROGRAV ADAPT-CONSTRUCTIONS<\/span><br \/>\n<\/span><span style=\"font-size: 26px;\"><strong><span style=\"color: #30355d;\">Bad Berleburg<br \/>\n<\/span><\/strong><\/span><\/p>\n<p style=\"text-align: justify;\"><em>\u201eNow I have only one problem on my wastewater treatment plant: with the sharp drop in the turbidity values after the commissioning of hydrograv Adapt the turbidity probe cannot handle the discharge. They are just too far below the measuring range.\u201c<\/em> \u2013 J\u00f6rg Sonneborn, head of the wastewater treatment plant Bad Berleburg<\/p>\n<p style=\"text-align: justify;\"><strong>Continuous utilisation of the flock filter in the secondary settling tank with hydrograv Adapt.<\/strong><\/p>\n<p style=\"text-align: justify;\">Because the inlet structure and thus the flow situation in the secondary settling tank always adapts to the current load.<\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #6482a0;\">\u00a0<\/span><\/p>\n<p style=\"text-align: justify;\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-5455 size-full\" src=\"\/wp-content\/uploads\/2017\/06\/Bad_Berleburg_Ablauftruebung_sk.jpg\" alt=\"\" width=\"780\" height=\"353\" \/><span style=\"font-size: 14px;\"><strong>Picture<\/strong>: Change of the discharge turbidity (blue graph) when turning on the control of the hydrograv Adapt inlet structure (because of a conversion of the PLS previously as a fixed inlet operating at an elevation of 1.5 meters above the sole recommended by the A 131 (2016)). Excerpt from the process control system. Immediate halving of the discharge turbidity after hydrograv Adapt has lowered itself automatically according to the current secondary settling tank load.<\/span><\/p>\n<p style=\"text-align: justify;\"><strong>\u00a0<\/strong><\/p>\n<p style=\"text-align: justify;\"><strong>The hydrograv Adapt system includes:<\/strong><\/p>\n<ul style=\"text-align: justify;\">\n<li>A robust and durable construction.<\/li>\n<li>Reliable mechanical engineering, consistently manufactured in stainless steel.<\/li>\n<li>A complex E\/MSR, on the basis of leading expertise, tailored to each individual wastewater treatment plant and therefore easily controllable.<\/li>\n<li>Numerous monitoring functions for the operator, alerts and alarms based on the latest methods.<\/li>\n<li>A sophisticated, computerized sludge management system that holds the maximum of the sludge in the activation \u2013 particularly in rainy weather when it is needed the most there.<\/li>\n<\/ul>\n<\/div><\/section><\/div><\/div><\/div><\/main><!-- close content main element --><\/div><\/div><div id='after_section_1'  class='main_color av_default_container_wrap container_wrap sidebar_right' style=' '  ><div class='container' ><div class='template-page content  av-content-small alpha units'><div class='post-entry post-entry-type-page post-entry-7633'><div class='entry-content-wrapper clearfix'>\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":25,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-7633","page","type-page","status-publish","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.hydrograv.com\/en\/wp-json\/wp\/v2\/pages\/7633","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.hydrograv.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.hydrograv.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.hydrograv.com\/en\/wp-json\/wp\/v2\/users\/25"}],"replies":[{"embeddable":true,"href":"https:\/\/www.hydrograv.com\/en\/wp-json\/wp\/v2\/comments?post=7633"}],"version-history":[{"count":5,"href":"https:\/\/www.hydrograv.com\/en\/wp-json\/wp\/v2\/pages\/7633\/revisions"}],"predecessor-version":[{"id":8816,"href":"https:\/\/www.hydrograv.com\/en\/wp-json\/wp\/v2\/pages\/7633\/revisions\/8816"}],"wp:attachment":[{"href":"https:\/\/www.hydrograv.com\/en\/wp-json\/wp\/v2\/media?parent=7633"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}